Quincy No. 2 leads the 2012 Winterail Photographer's Special.
Looking inside the cab of Quincy No. 2
Engineer unhooking the water line from Quincy No. 2
Quincy No. 2 filling up on water at the station.
Quincy No. 2 waiting at the Sunol station
Quincy No. 2 coming across the Farwell Bridge
Built in 1924, now operating on the Nile Canyon Railway pulling passenger excursion trains.